HOME | ABOUT US | HH GROUP | SERVICES | EVENT | CONTACT US
By Air, Sea & Land

Scope of Work
To supply Tug/Barge to transport 2 Units Dreggen Crane to Sembawang Shipyard alongside MV "Seven Borealis" Using derrick Huisman 5000 Tonnes SWL to lift and install both derricks on the vessel.
Totaling 48 hours of non stop work.


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


Copyright © 2012 Harbour Handlers (Pte) Ltd. All rights reserved.
86 Neil Road Singapore 088846    Tel: (65) 6221 1808    Fax: 6221 1022    Email: hhfrt@pacific.net.sg