HOME | ABOUT US | HH GROUP | SERVICES | EVENT | CONTACT US
By Air, Sea & Land


Transporting Fuel Gas Conditioning Unit 10.5m (L) x 4.0m (W) x 9.0m (H) - 70 tonnes to private jetty to roll onto barge

Receiving Boiler, 68 Tonnes and transport to Jurong Island, Tembusu Project

Fuel Gas Conditioning Unit roll onto barge to be deliver alongside heavy lift carrier at port

Unloading Boiler at site, Tembusu Project in Jurong Island

Fuel Gas Conditioning Unit being lifted by carrier BBC Kosan at the port, chartered by HHL bound for Dubai Dry Dock World

Transporting empty cable spool wt.61 tons for oil well project


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


Copyright © 2012 Harbour Handlers (Pte) Ltd. All rights reserved.
86 Neil Road Singapore 088846    Tel: (65) 6221 1808    Fax: 6221 1022    Email: hhfrt@pacific.net.sg